WHAT’S IN THE PIPELINE
Aura QLD – Left: Early groundworks are underway on this new centre. Recent storms flipped the site shed over, thankfully no one was inside. Virginia QLD – Below left: Work on this small but important expansion is coming to and end with the final touches on the fit out underway with the new hoist to be dropped in soon.
Wairau Valley NZ : – Above: All piling is complete, lift pit and walls underway with the ground floor slab booked in to be poured. Hoxton Park NSW – Below: Painting of the floor and walls is complete and fit out of the storage units is underway.
Warrawong NSW – Above: Overall site preparation is underway with the first ground floor slab built for this new expansion project.
Michael Macheledt & Craig Henery Development & Construction Team